Most museums go looking for international partners after they open. Lothal has collected thirteen before the doors are even hung.
That contrast sat at the centre of the second Governing Council meeting of the National Maritime Heritage Complex Society, chaired on Friday by Union Minister for Ports, Shipping and Waterways Sarbananda Sonowal. Phase 1A of NMHC Lothal is now past 82 per cent physical progress, and the remaining stretch is what everything else now waits on.
NMHC Lothal by the numbers

Before the detail, the shape of the project as reviewed on Friday:
- 82% — physical progress on Phase 1A
- 31 October 2026 — revised completion target
- 13 — countries that have signed MoUs
- 35+ — international partnerships being targeted
- 1,492 — artefacts ready for installation
- 70% — ASI excavation completed at the Lothal site
- 5,000 years — the span of maritime history the complex sets out to cover
Why thirteen flags matter more than one deadline
Deadlines slip. Partnerships compound. The thirteen countries now signed on with NMHC are Portugal, the United Arab Emirates, Vietnam, Thailand, the Netherlands, Denmark, Oman, Israel, Germany, the Republic of Korea, Italy, New Zealand and Singapore.
Discussions are open with several more, and the stated goal is a pipeline of over 35 partnerships.
These are not ceremonial signatures. Sonowal said the agreements will enable:
- Exchange of artefacts, replicas and ship models
- Joint research programmes
- Cultural engagement and programming
- A working channel for India’s maritime diplomacy
A gallery filled entirely from domestic collections tells one country’s story. A gallery stocked through thirteen maritime nations tells the story of the trade routes themselves — which is the harder and more interesting claim Lothal is making.
The 82 per cent is done. The 18 decides everything.
Reviewing construction, the Minister instructed implementing agencies to keep strict site supervision and hold the October target.
Still outstanding:
- Gallery 4
- Gallery 6
- Lothal Town reconstruction
- Aquatic Theming
These are not trim items. Galleries and themed environments are precisely the components visitors experience as the museum, which means the final fraction carries disproportionate weight against the deadline.
A finished building is not a finished museum
Here is the quieter risk in the review. 1,492 artefacts are ready for installation — and waiting on approvals.
Sonowal asked for those clearances to be expedited so exhibits can be commissioned in time for visitor operations. It is a useful reminder that construction and curation run on separate clocks. A complex could reach structural completion in October and still open with half-empty cases if paperwork lags behind concrete.
The institutional groundwork, at least, is settled. The NMHC Society has completed its statutory registrations — income tax exemption, CSR and Darpan — which together allow it to mobilise resources rather than depend solely on budgetary allocation. The Council also approved the NMHC Bye-laws, giving the Society a governance framework for its shift from a project under construction to an operating institution.
The campus that follows: lighthouse, dome and museotel

Phase 1A is the opening act. The Council reviewed proposals for Phase 1B and Phase 2, which read less like a museum extension and more like a destination masterplan:
- Additional galleries
- A 5D Dome Theatre
- A Coastal States Pavilion
- A Lighthouse Museum
- A Maritime Research Institute (MRI)
- A Museotel
- An Eco Resort
Two carry particular ambition. The Lighthouse Museum, planned with the Directorate General of Lighthouses and Lightships, could become the world’s tallest lighthouse museum. The Maritime Research Institute, developed with Indian Maritime University, is intended to give the site academic weight — scholarship produced at Lothal, not merely displayed there.
The museotel and eco resort point at the commercial logic underneath: visitors who stay overnight behave very differently from visitors who pass through in an afternoon.
Reaching Lothal: an expressway done, a rail plan signed

A destination in the Bhal region needs to be reachable. On that front the Council was given the most straightforwardly positive update of the meeting:
- The Dholera Expressway is complete
- The high-speed rail corridor plan has been finalised
- ASI excavation at Lothal stands at roughly 70 per cent
- The Government of Gujarat is supporting connectivity, power, water supply and visitor amenities
The excavation number deserves more attention than it usually gets. The Archaeological Survey of India’s work is not background activity beside the museum — it is the supply line. What is still being lifted out of the ground continues to shape what the galleries can eventually say.
Sonowal’s pitch: civilisation, not exhibition
Sonowal credited the project’s momentum to Prime Minister Narendra Modi’s vision, framing NMHC as an effort to revive and present a maritime civilisation spanning more than five millennia.
“Under the dynamic leadership of Prime Minister Modi, we are not just building a museum at Lothal, we are reviving five thousand years of India’s maritime civilisation and presenting it to the world,” he said.
He thanked the NMHC team, Indian Port Rail & Ropeway Corporation Limited, the Government of Gujarat, the Indian Navy, IMU, major ports and partner ministries, and said sustained coordination should let the complex emerge as a global landmark for both India’s maritime legacy and its future ambitions.
Timeline at a glance
| Milestone | Status |
| First Governing Council meeting | June 2025 |
| Dholera Expressway | Complete |
| High-speed rail corridor plan | Finalised |
| ASI excavation at Lothal | ~70% |
| Phase 1A construction | ~82% |
| Phase 1A completion target | 31 October 2026 |
| Phase 1B and Phase 2 | Under review |
Three things will decide whether October holds: the remaining galleries and theming finishing on schedule, artefact approvals clearing fast enough for 1,492 exhibits to be installed, and Phase 1B sanctions moving so the campus keeps growing after opening day.
The build is in its last stretch. The signatures are the variable.
FAQs
The National Maritime Heritage Complex at Lothal, Gujarat — a Government of India project presenting the country’s maritime history through galleries, research facilities and visitor attractions.
Phase 1A has crossed roughly 82 per cent physical progress.
The revised completion target for Phase 1A is 31 October 2026.
Portugal, the UAE, Vietnam, Thailand, the Netherlands, Denmark, Oman, Israel, Germany, the Republic of Korea, Italy, New Zealand and Singapore — with a target of more than 35 partnerships overall.
Additional galleries, a 5D Dome Theatre, a Coastal States Pavilion, a Lighthouse Museum, a Maritime Research Institute, a Museotel and an Eco Resort.